>> click on picture for fullscreen view <<

 

[back]

Grid-connected

During the day, the production of the SE system is usually higher than the consumption in the house.

The excess electricity is fed into the power line, i.e. one gives electricity to the public power supply; the meter spins backwards.

During the night, the SE system produces no electricity.

The required electricity is now taken from the power line, i.e. one gets back electricity from the public power supply.